Apsara offshore Cambodia on track for mid-year start-up

KrisEnergy anticipates first oil from the Apsara field development in block A offshore Cambodia around mid-year.

KrisEnergy anticipates first oil from the Apsara field development in block A offshore Cambodia around mid-year.

Renovation and upgrades of the Ingenium II production barge continue in the Benoi yard and Gul drydock in Singapore. Installation and integration have been completed of the new power generation equipment, central control room, electrical switch room, living quarters, pedestal crane, electrical transformers and produced water processing package, and mechanical completion of all systems should finish shortly ahead of commissioning.

Construction of the topsides and jacket for the minimum facilities wellhead platform started in December at the PT Profab1 facility on Batam Island, Indonesia. Once concluded, this will be loaded onto a barge for transportation to the field location.

In full: https://www.offshore-mag.com/field-development/article/14168827/apsara-oil-field-offshore-cambodia-on-track-for-midyear-startup

Related Stories

Latest News